Turbogenerator ГТГ-6-2ЗУ3-П for Operation during Interfacing with Steam Turbine
Synchronous turbogenerator ГТГ-6-2ЗУ3-П of three-phase AC current with frequency of 50 Hz, with a closed ventilation cycle is designed to generate electricity as a part of steam turbine power plants when interfacing with a steam turbine.
Turbogenerator ГТГ-6-2ЗУ3-П was developed and manufactured as an alternative to replace overaged or failed turbogenerators with similar capacity made by both domestic and foreign manufacturers, with installation on the existing foundation.
Product catalogs
Generators (pdf, 4.29 Mb)