A 16 MW turbo generator has been put into operation
31.08.2023
The asynchronous explosion-proof turbine generator TTK-16-1500- 4UHL3-G with a capacity of 16 MW has been put into operation at the Cherepovets Metallurgical Combine. Turbo Generator TTK -16-1500- 4UHL3-G is designed to generate electricity when connected to a gas turbine. The generator is equipped with a brushless excitation system.
The generator has an explosion-proof level of explosion protection with the type of explosion protection "Filling or purging the shell under excessive pressure p" and an explosion protection marking 1Ex px IIA T3 Gb X.
The quality of manufacture and reliability of generators in operation is confirmed by the presence of a certificate of conformity TR CU 012/2021.